Semi-automatic LED ceiling lamp Acrylic/ PC shell blowing forming machine
- Description
- Inquiry
Description
Description
This machine is based on infrared radiation heating, positive pressure blow up molding equipment, and through the specialized design, elaborate, make you simple operation, easy to use which is a simple chimney or light box production equipment.
The machine data of forming part
Model | LSF-600 |
Forming Dia. | ≤600mm for the lampshade |
Forming height | ≤150mm |
Forming Thickness | 1-3.5mm |
Color | As the client’s requirement |
Power supply | 380VAC/3phase/50HZ |
Upper mold | Hydraulic pressure + Hinge |
Air pressure | 0.5-0.8Mpa |
Suggest air compressor | 15HP |
PLC and Touch screen | “Mitsubishi” Japan |
Touch screen | “WeinView” Taiwan |
Safety device | Safety curtain |
Switch | “DELIXI” or “CHNT” China |
Air Cylinder | “Zhicheng” China or “Airtac” Taiwan |
Electromagnetic Valve | “Airtac” Taiwan |
Consumption | 100W |
Machine size(L×W×H) | 2000*1300*2100mm |
Machine weight | 1500KG |
The machine data of heating part
Model | LSF-600H |
Forming Thickness | 1-3.5mm |
Color | Same with forming part |
Power supply | 380VAC/3phase/50HZ |
Relay | “ Schneider “ |
Temperature controller | SKG |
Infrared ceramic heater | “SME” China |
Consumption | 22KW |
Machine size(L×W×H) | 2240*1120*1330mm |
Machine weight | 800KG |
The mold
Spare part list
No. | Spare part | QTY | Remark |
1 | Infrared ceramic heater | 10pcs | China |
2 | High temperature resistant flannelette | 4pcs | |
3 | Switch | 2pcs | |
4 | Solenoid valve | 2pcs | |
5 | Contactor | 2pcs | |
6 | Thermal probe | 2pcs |
Payment Terms: T/T 40% deposit before production, 60% balance due before delivery date;
Delivery time: 25-35 business days after deposit;
Validity: 30 days after quotation.
Departure Port: Guangzhou Huangpu port
Packing: wooden block (The EXW price is just simple packing. Not the wooden block.)
Warranty: We guarantee these machines for one year. And we supply some spare parts with the machine.
Service: We will send engineer who install and train in your company for approximately 7 to 10 days, after machine is arrived your place. And the flight tickets, visa and accommodation of engineer will be arranged by buyer, also the buyer need pay 100 USD/day for training cost.